Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Global aviation news tracker
Global aviation news tracker

Salt Lake City airport expansion adds 10 gates at SLC, boosting capacity for Delta (DL) and Southwest (WN).
Salt Lake City International Airport (SLC) has opened 10 new gates and more than 8,000 sq. ft. of concessions space to ease crowding and speed turn times at the Delta Air Lines (DL / DAL) hub. The addition aims to unclog peak-hour flows and give both Delta and Southwest Airlines (WN / SWA) extra boarding capacity at a busy western U.S. gateway.
The new gates are part of a broader modernization push at SLC to address rising passenger demand and capacity constraints facing U.S. airports. Airports nationwide are contending with an estimated $174 billion development need over five years to upgrade terminals, gates and baggage systems — making local projects like SLC’s important test cases for faster passenger processing and better airline operations.
Delta operates a major hub at SLC, and the extra gates give DL (ICAO: DAL) more scheduling flexibility during peak windows. Southwest (IATA: WN, ICAO: SWA) also benefits from the added capacity, which should reduce delays tied to gate shortages and improve connection times for passengers connecting across carriers at SLC.
Beyond gates and retail, airport officials say the work is designed to streamline passenger movement from security to departure and to create more reliable turnaround times for narrow- and wide-body operations. While the project addresses local congestion, industry analysts note that nationwide funding and multi-year construction plans will be needed to fully close the gap in U.S. airport infrastructure.
For travelers, the upgrades at SLC should mean shorter waits, more food and shopping options, and fewer gate-driven delays — a visible, near-term improvement as airports tackle a much larger system-wide challenge.